(everyone knows roading budgets usually blow out - the total final cost of Transmission Gully appears to be $2.5bn – double the projected cost of $1.25bn).

  • philanthropicoctopus
    link
    fedilink
    arrow-up
    2
    ·
    11 days ago

    Thanks

    That’s absolutely insane. Imagine if that was the number in the proposed plan. Would have been squashed instantly