• Matt@lemmy.blahaj.zone
    link
    fedilink
    English
    arrow-up
    8
    ·
    8 个月前

    The issue is with how we prioritize rail. When grade crossings are installed, they are the least path of resistance, but also are the biggest obstacle in planning. If we really want to see better rail, we need to pay for the infrastructure (ie, elevated crossings). That’s not to say every route needs the best infrastructure, but at least the busiest.

    • grue@lemmy.world
      link
      fedilink
      English
      arrow-up
      8
      ·
      8 个月前

      The other issue is how 150 years ago we gave railroads incredible handouts of land ownership, not just in terms of the amount of land, but also in terms of the type of ownership. In a lot of cases, railroads have more sovereignty over their land than do the local and state jurisdictions it runs through. If you’re a city trying to improve a railroad crossing and the railroad doesn’t feel like cooperating, you’re just fucked with zero recourse.