cross-posted from: https://lemmit.online/post/2819356
This is an automated archive made by the Lemmit Bot.
The original was posted on /r/edmonton by /u/Shutupayafaceawight on 2024-05-02 06:24:16.
cross-posted from: https://lemmit.online/post/2819356
This is an automated archive made by the Lemmit Bot.
The original was posted on /r/edmonton by /u/Shutupayafaceawight on 2024-05-02 06:24:16.
I’m my area there was a big project and they were posting the progress on a local news site. When they reached 90% it got stuck for a long time until they finally got updated to 70% or so. They removed the progress bar shortly after
Classic progress bar problems.
That’s why I prefer adding leek spinners instead.