• ohulancutash@feddit.uk
    link
    fedilink
    English
    arrow-up
    2
    arrow-down
    1
    ·
    edit-2
    5 days ago
    • No prior experience in building and operating high speed rail.

    • Track standards must be much higher.

    • Track must be completely secure from people and animals, and geology. This means high fences and shallow cuttings set far back from the running lines.

    • The line can only be crossed by bridges or tunnels. No level crossings.

    • Long distances pose issues in crew turnaround.

    • Track must be as straight and flat as possible. North America has space, but also has geography.

    • Reliable catenary power supply.