• schmidtster@lemmy.world
    link
    fedilink
    arrow-up
    4
    arrow-down
    9
    ·
    1 year ago

    Who charges overnight? Everyone just plugs it in when they get home. It’s an issue that can’t just be handwaved away like that.

    Sure stuff can be on a timer, but codes need to be presented, adopted and they need to installed. That takes years, it’s already too late.

    • Nik282000@lemmy.ca
      link
      fedilink
      arrow-up
      9
      arrow-down
      2
      ·
      1 year ago

      Dude, electric car’s are about 25 computers on wheels. Adding a “charge between hours” function is so trivial I would be surprised if it doesn’t already exist. But no, you’re right, computers are a complicated pipe dream, we should all go back to coal burning, steam powered, difference engines and horseless carriages.

      • MinisterOfNoms@lemmy.ca
        link
        fedilink
        arrow-up
        13
        arrow-down
        1
        ·
        1 year ago

        I own an EV and there’s definitely a setting in the car to specify what time of day to charge (and my charger itself also has an app where I can specify that time restriction).

        • schmidtster@lemmy.world
          link
          fedilink
          arrow-up
          2
          arrow-down
          7
          ·
          1 year ago

          Panel and code calculations don’t care about those yet and it’s going to be a long time until they do.

          • joshhsoj1902@lemmy.ca
            link
            fedilink
            arrow-up
            7
            arrow-down
            1
            ·
            1 year ago

            It’s fun seeing someone with so little understanding of electricity spreading the misinformation someone else fed them.

            Most houses existing panel have the capacity for a level 2 charger.

            • Boxtifer@lemmy.world
              link
              fedilink
              arrow-up
              3
              ·
              1 year ago

              100amp or 200amp? I figured a main upgrade will be inevitable with the push to electrify more than the car in houses.

              • joshhsoj1902@lemmy.ca
                link
                fedilink
                arrow-up
                1
                ·
                1 year ago

                Depends, a 200amp nearly for sure has capacity. A 100amp likely does, but depends how electrified they already are, but many smaller houses that still heat with natural gas will have lots of space left in a 100 amp service

            • schmidtster@lemmy.world
              link
              fedilink
              arrow-up
              1
              arrow-down
              4
              ·
              1 year ago

              Strange, most homes where I live only have 20-50 amp services, neither being enough for a level 2 with all the other required panel loads.

              News flash, codes are different in different places!

      • schmidtster@lemmy.world
        link
        fedilink
        arrow-up
        2
        arrow-down
        5
        ·
        1 year ago

        Codes and standards need to adopt those functions, right now there is only a couple of code complaint ways to deal with it on a panel end.

        • Boxtifer@lemmy.world
          link
          fedilink
          arrow-up
          5
          arrow-down
          1
          ·
          1 year ago

          Can you explain why that matters if the hardware at the charger could initiate and control all that?

          • schmidtster@lemmy.world
            link
            fedilink
            arrow-up
            2
            arrow-down
            3
            ·
            1 year ago

            If it’s permanently installed it’s potential needs to be accounted for at all times, there is some conditionals, like ignoring AC during winter, but there’s nothing for intermittent loads, since it can still potentially be done at anytime.