silence7@slrpnk.net to World News@lemmy.worldEnglish · 10 months agoUK nuclear plant hit by new multiyear delay and could cost up to £35bn | Latest overrun to Hinkley Point C a blow to UK energy plans and French constructor EDFwww.ft.comexternal-linkmessage-square15fedilinkarrow-up195arrow-down13
arrow-up192arrow-down1external-linkUK nuclear plant hit by new multiyear delay and could cost up to £35bn | Latest overrun to Hinkley Point C a blow to UK energy plans and French constructor EDFwww.ft.comsilence7@slrpnk.net to World News@lemmy.worldEnglish · 10 months agomessage-square15fedilink
minus-squaresilence7@slrpnk.netOPlinkfedilinkEnglisharrow-up9arrow-down2·10 months agoAt the cost it comes in at, it competes with longer-duration energy storage. Very expensive, and only has value to the extent that it reduces the need to build storage instead.
At the cost it comes in at, it competes with longer-duration energy storage. Very expensive, and only has value to the extent that it reduces the need to build storage instead.