Let’s have a lunch and learn!

  • A_Porcupine@lemmy.world
    link
    fedilink
    arrow-up
    4
    ·
    2 hours ago

    One company I worked for decided it was a good idea to name a bunch of firings due to performance “Project Panda” 🤦

    • arrakark@lemmy.ca
      link
      fedilink
      English
      arrow-up
      1
      ·
      51 minutes ago

      I mean that one is kinda funny. “Project Sloth” might have worked a bit better but been too on the nose.

    • TheDoozer@lemmy.world
      link
      fedilink
      arrow-up
      1
      ·
      31 seconds ago

      I mean, yeah, but actually streamlining things is something I like. I work on helicoptersn so example:

      Aircraft is broken because of a faulty component. So the maintainer has to go and sign on to our grossly over-bloated computer (which can take anywhere from 5 to 45 minutes to start up), look up the relevant illustrated parts breakdown and download it (because they’ve moved everything to the cloud from our previous local servers) which runs through our exceptionally bottle-necked security system (seriously, usually ~50-100kbps download on a 100Mbps connection), find the part, log into a different system to get the national standard number and see what type it is to find what system to look in to see if we have it, look up the part location. Look up the maintenance procedure card (which is not classified) from the same place as the manual, download it at 100kbps, figure out the operational check for the replaced component is not in the card but in a separate maintenance manual, go back into that system and download that manual, find the ops check. Try to print out both the card and the ops check from whatever printer wants to work today. Fill out a requisition form, grab the part, and now you can start the job. Basically, add approximately an hour of work to any task for this nonsense.

      Streamlined: Have a standalone computer that is not connected to the internet, is regularly updated via approved external hard drive with the latest Maintenance Procedure Cards and manuals, pre-filled requisition forms (with locations) for parts, lists of consumable components (like gaskets) for each repair, connected to a standalone printer hardwired to the standalone computer. Pull up card, manual, form, and ops check and print in 5 minutes.

      Finding time wasters that only serve to frustrate workers and finding ways to cut those time wasters out makes the workers and the managers happy, assuming the people doing the job want to do the job well and quickly (we all want to be here, so that describes our hangar deck).

      I’m a fan of streamlining.

  • AstralPath@lemmy.ca
    link
    fedilink
    arrow-up
    6
    ·
    3 hours ago

    For me its more of a lack of understanding of a specific word’s definition. The word? "Systematically"

    “There’s a problem systematically, so IT is gonna have to look at that.”

    They literally mean there is a problem with a computer or software and not anything related to a systematic process.

    This drives me right up the wall. Everyone in management says it like a buzzword.

  • y0kai@lemmy.dbzer0.com
    link
    fedilink
    English
    arrow-up
    11
    ·
    5 hours ago

    “Department / Corporate Retreat”

    As in, “we’re holding our annual corporate retreat next Wednesday! It’ll be offsite, you’re all required to be there, and we’ll be spending the day having a 6 hour meeting about absolutely nothing, just like we do every year. But dont worry, when we’re done we’ll play a game no one wants to play, or do a craft no one wants to do, but everyone will pretend they enjoy it because if they don’t, they’re not ‘team players.’”

    This year, our day-long-nothing-meeting was about how management is working to secure everyone’s jobs despite budget cuts, and we have nothing to worry about. Then we took a personality quiz that said I was a character from Stranger Things. Then the next day, they told me I’m getting laid off and have 3 months left at the company.

    Fucking RETREATS are so relaxing.

  • Whitebrow@lemmy.world
    link
    fedilink
    arrow-up
    12
    ·
    7 hours ago

    MVP - as in “minimum viable product”

    More commonly known as the slop of a product or solution that’s being slinged to all the markets early on without adequate documentation, support, usability, scalability, standards or security.

    “Corner the market” also deserves a disgusting mention.

    • feddup@feddit.uk
      link
      fedilink
      English
      arrow-up
      6
      ·
      6 hours ago

      Especially if the MVP ends up with a lot of scope creep for features that are not MVP

  • TheDeadlySquid@lemm.ee
    link
    fedilink
    English
    arrow-up
    13
    ·
    7 hours ago

    “We work hard and play hard” makes my skin crawl. Also, had a manager who would describe every situation with a war analogy. Sorry Bob, this is Finance, we’re not literally killing each other. Take it down a notch.

  • AA5B@lemmy.world
    link
    fedilink
    arrow-up
    7
    ·
    edit-2
    7 hours ago

    “You don’t have a sense of urgency to get things done”. I usually get this when I’m going crazy to get things done so my status reports and presentations suffer. I understand paperwork is necessary, but can’t you at least say that rather than claiming I’m not getting things done. Meanwhile they’re satisfied with my sends of urgency to get things done if I just ignore my work and pamper them with status reports and PowerPoints.